Equipment List
|
Equipment |
Qty |
Model |
Origin |
Precision (mm) |
|
CMM |
1 |
Micro-HITE3D |
Switzerland |
0.002 |
|
Projector |
1 |
EASSON |
Japan |
0.005 |
|
Milling machine |
6 |
1K831413 |
Taiwan |
0.5 |
|
Milling machine |
15 |
1K831404 |
Taiwan |
0.5 |
|
CNC(HSP) |
1 |
MIKRON VCP 800 |
Switzerland |
0.002 |
|
CNC(HSP) |
1 |
JINZUN |
Taiwan |
0.003 |
|
CNC |
3 |
XINFeng |
Taiwan |
0.005 |
|
Mirror EDM |
1 |
Sodick |
Japan |
0.003 |
|
EDM |
9 |
SASIA |
Taiwan |
0.005 |
|
Lathe |
2 |
NOUXIN |
Hongkong |
0.01 |
|
Grinding |
8 |
FUKEXING |
Taiwan |
0.003 |
|
Wire EDM |
4 |
Sodick |
Japan |
0.002 |
|
Wire EDM |
7 |
SUSANGUANG |
Taiwan |
0.005 |
|
Injection machine |
10 |
Hengsheng |
China |
60T~550T |
Welcome
Why Johnson-Manu
• The fastest feedback,16 hours online daily for any RFQ,engineering consulting& questions.
• The shortest mold building leadtime,3~7 weeks for most of molds.
• The optimal mold design focused to cut cycle time and avoid unnecessary corrections.
• Dimensioning&Tolerance&machining process focusing.
• The fastest feedback,16 hours online daily for any RFQ,engineering consulting& questions.
• The shortest mold building leadtime,3~7 weeks for most of molds.
• The optimal mold design focused to cut cycle time and avoid unnecessary corrections.
• Dimensioning&Tolerance&machining process focusing.
